Powered by ChronoForms - ChronoEngine.com
Terms and Conditions: Fixed price install is indicative and is based on Existing distribution board has the capacity/spare ways to facilitate additional MCB’s/RCBO’s required for the EV Charger (x2 ways required). Wallbox EV Charger to be mounted within 5m of the existing distribution board. This must be on the same level and within the same room. All new cabling will be reticulated via surface mounted conduit/trunking.
Any additional materials outside of the above parameters will be charged at trade price. Any additional labour for installations outside of the above parameters will be charged at $84.20 p/hr